Showing posts with label Environmental. Show all posts
Showing posts with label Environmental. Show all posts

Wednesday, September 07, 2011

Sept 14 is BIA Deadline for EIS Public Comment on Barstow Casino Scheme (Los Coyotes with Barwest/Ilitch/Malik)

REMINDER:  The Bureau of Indian Affairs (BIA) is taking comments on the environmental impact statement for the proposed Los Coyotes/Barwest (Marian Ilitch/Michael Malik) Barstow casino.  The deadline for public comment is September 14. Barstow (San Bernardino County) is more than 100 miles from the Los Coyotes reservation (San Diego County).

The BIA is reviewing the proposed Los Coyotes/Barwest casino under the two-part determination section of the Indian Gaming Regulatory Act.  A bill, S.1424, intended to restrict off-reservation gaming has been introduced by U.S. Sen. John McCain (R-Arizona).  If approved, it would replace that two-part determination section with an entirely new set of standards and conditions.

Contact Info:
U.S. Department of Interior,
Bureau of Indian Affairs
Pacific Region
2800 Cottage Way
Room W-2820
Sacramento, CA 95825

Saturday, December 13, 2008

Mike Malik received DEQ permit to dredge two lakes at his Paradice Hunt Club

The following public notice was published to inform the public of a hearing to consider allowing property owner Michael J. Malik, Sr. to dredge and complete other related work surrounding two lakes at his Paradice Hunt Club, a private 1000-acre commercial game reserve and hunting grounds.

The public notice reveals details about Paradice Hunt Club and it's surrounding locations.
    SEPTEMBER 14, 2001
    8:00 p.m

    PUBLIC HEARING ON PERMIT APPLICATION SUBMITTED BY MIKE MALIK, DETROIT, MICHIGAN. The Land and Water Management Division will hold a public hearing at the Edwards Township Hall, 3601 Wicks Road, West Branch, Michigan. The hearing will be for Permit Application Numbers 01-65-0038-P and 01-72-0029-P, submitted by Mike Malik, 2211 Woodward Avenue, Detroit, Michigan. The applicant proposes to dredge in three areas of wetlands that are located along the shoreline fringe of Little Frost Lake to facilitate fishing and swimming. The total amount of dredging would be 9,377 cubic yards and would be disposed of on the applicant’s property to the northeast of Little Frost Lake. Also proposed is the dredging of 77 cubic yards of sediment from Campbell Lake and the construction of a boat launch and dock. The projects are for private use and are on the same property located in Edwards Township, Ogemaw County, and Nester Township, Roscommon County, Michigan. Information Contact: Brian Rudolph, Land and Water Management Division, 989-686-8025, extension 8366.

Microsoft maps.live.com: Paradice Hunt Club
Topo Map: Paradice Hunt Club and surrounds
See Google Maps: Paradice Hunt Club

Sunday, August 31, 2008

Mike Malik denied permit to develop Harsens Island Marina

8.31.08

Island permit denied

By BOB GROSS

The state Department of Environmental Quality has denied a marina permit for a 348-unit clustered housing development on the former Boys Club property on Harsens Island.

According to a letter from David Dortman, environmental quality analyst for the DEQ’s Land and Water Management Division, the proposed project “will have significant adverse impacts on the natural resources associated with the St. Clair River.

The developers, Grande Pointe Development and Lucky 7 Development LLC, had applied for the permit on May 1.

The proposed planned unit development has met with opposition from island residents. On Feb. 27, the Clay Township Planning Commission rejected a special land use request that would have allowed construction of the project.Grande Pointe and Lucky 7, which are owned and managed by former Clay Township resident Michael Malik, filed an appeal of the planning commission’s decision in St. Clair County Circuit Court. That appeal is still moving through the legal process. (Complete Story)

Thursday, July 31, 2008

Malik's legal appeal for right to develop houses and a marina on Harsens Island moves forward

7.30.08


Harsens Island development appeal heading for final pretrial

By Nicole Tuttle
Voice Reporter

The appeals process for two development companies looking to build a housing project on Harsens Island will take another step forward.

St. Clair County Circuit Judge Daniel J. Kelley ruled last week that the final pretrial hearing for Grand Pointe Development LLC and Lucky 7 Development LLC will be Aug. 25.

The date was set after Kelly heard the pretrial for the case July 21 in chambers. The case originally had been scheduled for Circuit Judge Peter Deegan's courtroom, but was moved after a conflict of interest surfaced when attorneys involved learned that Deegan's court reporter, Kathy Schweikart, is a member of the Clay Township Planning Commission.

The case is in court because the developers are appealing the planning commission's decision to reject a request for a special land use. The developers planned to create a 348-unit cluster housing development on the former Boys' Club property on the North Channel. The developers appealed the decision to the circuit court March 19.

Clay Township John McNamee said the judge will want to review documents, such as possibly the minutes of the planning commission meeting and what the commission considered before rendering a decision.

He said that he and Gary Fletcher, attorney for Grande Pointe Development LLC and Lucky 7 Development LLC in the case, will need to determine which documents relating to the planning commission decision can be submitted to the judge for review.

"The court wants us to reach an agreement as to what is the appropriate record for review," McNamee said.

Once this process is complete, the judge will set a schedule for attorneys to submit briefs, Fletcher said.

In addition to the appeal, developers applied to the Michigan Department of Environmental Quality's Land and Water Management Division in 2007 for dredging and a marina operating permit. The project would impact 16.6 total acres of wetland with excavation and fill activities. Existing roadways would also be impacted. The DEQ will make a decision on the permit on Aug. 28.


Click here to return to story: http://www.voicenews.com/stories/073008/loc_20080730009.shtml

NOTE: Grande Pointe Development LLC and Lucky 7 Development LLC are entities controlled by Detroit-casino syndicator and developer Michael J. Malik, Sr. Mike Malik shares an office at the headquarters of Ilitch Holdings, Inc. and has partnered with Mrs. Marian Ilitch on various casino ventures.

Developer still in pursuit of Harsens Island Bridge despite set backs

7.30.08


Harsens Island bridge stalled in negotiations

By Nicole Tuttle
Voice Reporter

Developers of the Harsens Island bridge [aka Harsens Island Crossing] are currently negotiating roadblocks to their progress with the Department of Environmental Quality.

The bridge, which would link the Algonac mainland to Harsens Island over the North Channel, is the project of the Detroit International Bridge Company. The private company seeks to build the bridge as a commercial venture.

The Harsens Island Transportation Authority met with the bridge developers July 15 at the Harsens Island Lions Hall. Don Verslyte, a member of the HITA who led the meeting, said that Bridge Company President Dan Stamper told HITA they were working to overcoming the objections that caused the DEQ to deny them a permit to build the bridge. The DEQ denied the permit last year.

One objection was the question of riparian rights. The bridge plans interfered with some privately owned property. Verslyte said Stamper told the HITA they had overcome this by purchasing a marina.

Another objection related to interference with the spawning ground of sturgeon. Verslyte said Stamper told the HITA there was no spawning ground where the bridge would cross.

"They resolved that by taking pictures of the bottom," Verslyte said.

Verslyte said Stamper told the HITA the company would be willing to provide funds to help build a spawning ground on Dickinson Island.

The third objection related to interference with wetlands on the island side of the bridge. Verslyte said Stamper told HITA the issue was still under discussion with the DEQ, but the company anticipates resubmitting for a permit with the U.S. Coast Guard within 45 days.

Stamper did not return messages by Voice deadline.

Robert McCann, a spokesman for the DEQ, said the company has not actively pursued an appeal of the denial. "They have the option to appeal or start over with new plans," he said.

Discussions of the issues, particularly the sturgeon and wetlands issues, are still under discussion with the DEQ and the Department of Natural Resources, McCann said.

"We have been discussing the issue with them," he said. "We have heard both for and against from the public."

The DNR is still in discussions with the developer regarding the sturgeon issue, said Mary Dettloff, a DNR public information officer. She said that the DNR has caught sturgeon in the area.

"There would be a loss of aquatic habitat if the bridge is built," Dettloff said.

Dettloff said the DNR has worked with other developers in the past to create "mitigation for loss of habitat" and that would be part of the permit process.

One area that the HITA is concerned with is working out an agreement with the company to control toll rates, Verslyte said.

"That is a problem we have now with the ferry system," Verslyte said.


Click here to return to story: http://www.voicenews.com/stories/073008/loc_20080730007.shtml

Monday, June 30, 2008

Great Lakes residents urged to fight plans for Harsens Island marina development

6.30.08

Letter-to-the-Editor
Great Lakes residents must fight island plan


On June 24, there was a public hearing held at Algonac High School for the Michigan Department of Environmental Quality on a "proposed" $170 million marina cluster housing development on Harsens Island. This development requires an "approved" marine operating permit as it involves "vast dredging" into the St. Clair River and 370 acres, along with removal of acres of protected wetlands and the removal/rerouting of a major county road, North Channel Drive.

The Clay Township Planning Commission already denied the plan, along with the community. The developers are appealing their case in St. Clair County Circuit Court.

Without a doubt, this development will cause irreparable damage to the ecosystem of our Great Lakes Region. This small community has been fighting alone for nearly 20 years to save our environment. Everyone who lives in the Great Lakes Region should be concerned about it.

The public should be aware of who is financially backing and would gain the most for this proposed development. I'm sure Michael Malik, who has worked closely on casino developments with Detroit businesswoman Marian Ilitch, would encourage everyone to visit the DEQ Web site and view their proposed development permit No. 07-74-0161.

The DEQ is open to public statement and e-mails on this development until July 4. The DEQ Web site is www.deq.state.mi.us/ciwpis/. Type in the permit number to view the Grande Pointe Development LLC and Lucky 7 Development LLC plans. Send e-mails to dortmand@michigan.gov.

DONNA HALACOGLU
Harsens Island, June 27

Monday, May 05, 2008

Who told Arnold Schwarzenegger that the Big Lagoon was "pristine?"

As published at CA.gov Envirostor regarding the so-called "pristine" Big Lagoon in Humboldt County, CA:

FROM THE CORPS PUBLIC GIS SYSTEM: Property Description - The 153.03-acre site is located in Humboldt County, Big Lagoon, California, near the Big Lagoon Indian Reservation. The property is currently part of the Dry Lagoon State Park and is adjacent to the Big Lagoon County Park. During the 1920s and 1930s, cabins were built at the south end of the lagoon and the area was a popular destination for weekend and summer travelers. Many of the old cabins still exist alongside newer houses, several of which appear to be inhabited year round. The area remains a popular destination for camping, boating, fishing, swimming, and beach combing. Property on the southeastern side of the lagoon is part of the Big Lagoon Rancheria, inhabited by the Yurok and Tolowa tribes.

Property History - The Big Lagoon Range consists of land that was acquired by leasehold condemnation on 13 June 1944. The mission of this site was the installation of rocket targets for the training of Fleet Air Squadrons from NAAS Arcata. Due to existing hazardous conditions, the Fleet Air Training Detachment withdrew from the Station on 1 July 1945, stripping its targets and removing all squadrons, Fleet personnel, and equipment. The lease was terminated on 14 April 1946. After this, the site was divided among the state of California and Humboldt County. This property is known or suspected to contain military munitions and explosives of concern (e.g., unexploded ordnance) and therefore may present an explosive hazard.

Other resources:
Calif.gov - EnviroStor
U.S. Army Corps of Engineers, Sacramento District, Formerly Used Defense Sites (FUDS) Program
2007 Defense Department’s Annual Report To Congress – Big Lagoon Bombing Target Clean Up costs $8.6 million
U.S. Army Corps of Engineers - Big Lagoon Survey Maps
U.S. Army Corps of Engineers – Big Lagoon Hazardous Potential
GAO.gov - California: Cleanup Projects
Memorandum to Commander U.S. Army Engineer Division on risks at Big Lagoon
Sacramento Bee – Inventory of California Former Defense Sites
California State Military Museum - Big Lagoon Bombing Target Number 12
Wikimapia.org
Big Lagoon Bombing Target Inventory Project Report
Big Lagoon Bombing Target Map
Big Lagoon Bombing Target Cover Letters
Big Lagoon Bombing Target Site Maps
Big Lagoon Bombing Target Inventory Project Report and Real Property Report Maps
Big Lagoon Bombing Target Historical Documents
Big Lagoon Bombing Target ED Project Review and Comment Instructions
Big Lagoon Bombing Target Real Property Report
Big Lagoon Bombing Target MMRP Project Cover Letters
Big Lagoon Bombing Target Archive Search Report Findings
Big Lagoon Bombing Target MMRP Project Area of Concern Range Map
Big Lagoon Bombing Target Archives Search Report Maps
Big Lagoon Bombing Target Range Inventory Working Data

Tuesday, July 24, 2007

EDITORIAL: The first of Mike Malik's failed attempts to develop a Marina on Harsens Island

According to an Editorial published in the Port Huron Times Herald on 07.24.2007:

...Mike Malik, a former Algonac city councilman is a close associate of Detroit's influential Ilitch family.

Malik is the chief promoter of a proposed casino at the Thomas Edison Inn in Port Huron. He also has big plans for the 430 acres he controls on Harsens Island. For starters, he wants to dig a boat basin and surround it with scores of McMansions and townhouses.

Fifteen years ago, Malik and wealthy toolmaker Fred Smith of Mount Clemens proposed transforming old CampBold Drusilla Farwell into a Victorian-style resort called Grande Pointe Marina. The $100 million development would have included a hotel, 18-hole golf course and a sprawling marina with at least 1,150 boat slips.

The Harsens Island Preservation Association, led by A.J. Feeney, put up spirited opposition. On March 4, 1992, when the U.S. Army Corps of Engineers closed the public-comment portion of its permit process, it had received 275 letters of opposition and only 12 in favor of Grande Pointe Marina. The project died...

Monday, June 25, 2007

Feds postpone $8.5 million hazardous clean up of former Big Lagoon bombing range





In its last release FY 06, the Defense Environmental Programs Report to Congress (DEPARC) notes the environmental clean up of the former Big Lagoon Bombing Target Range in Humboldt County, CA, has once again been postponed several more years.

The clean up project which has been on a long list of the military's hazardous clean up sites for years now is estimated to cost the federal government almost $8.5 million in FY '07 dollars and the start date was tentatively pushed into FY '08 for budget estimating purposes.

DERP Search & Additional Information [type "Big Lagoon" (no quotes) in installation name box]
Army Corps of Engineers Map: Big Lagoon 12th Naval District Target No. 12, CA
DERP Installation Report: Big Lagoon Bombing Target/CA99799F527200/C-EST

Thursday, May 31, 2007

Schwarzenegger issues press release, documents on gaming compact extensions


FOR IMMEDIATE RELEASE
5.31.07


Gov. Schwarzenegger Announces Extension for Big Lagoon and Los Coyotes Gaming Compacts

Governor Arnold Schwarzenegger today announced an agreement between his Administration, Big Lagoon Rancheria of Humboldt County and the Los Coyotes Band of Cahuilla and Cupeno Indians in San Diego County to extend the date the compacts must take effect and the date the land the casino will be built upon must be taken into trust by the federal government.

"This unique collaboration saves pristine coastline and protects the state’s biggest estuary. Today’s agreement gives the Legislature until the end of this year’s session to approve this balanced solution to a dilemma that has spanned more than a decade," said Gov. Schwarzenegger.

"One must see the land surrounding this potential casino site to understand that Big Lagoon is a place of statewide environmental significance," said Ruth Coleman, director of State Parks. "It is an extremely fragile wetland and placing a casino there would impact three nearby state parks and damage the lagoon's unique ecosystem. We applaud the tribes for protecting this land and urge the Legislature to approve their efforts."

The original compacts authorize the Big Lagoon Rancheria of Humboldt County and the Los Coyotes Band of Cahuilla and Cupeno Indians in San Diego County to establish a single, unified casino project in the City of Barstow on a piece of property identified by the City. The City sought to have a casino located in Barstow and had previously entered into an exclusive arrangement with the Los Coyotes Band to allow for the construction of a casino. As a condition of its compact with the state, the Los Coyotes Band agreed to share its site in Barstow with the Big Lagoon Rancheria and forgo the right to conduct gaming on its tribal lands in San Diego County.

Big Lagoon Rancheria, in exchange for the right to locate its gaming operations in Barstow, agreed to refrain from building a casino or any other commercial development on its tribal lands along the coast of northern California. The Big Lagoon Rancheria's lands are adjacent to park land and Big Lagoon, one of the few remaining naturally functioning coastal lagoons in the state.
The lagoon is managed by the Department of Fish and Game as an ecological preserve and is part of a fragile coastal ecosystem supporting a diverse species population that includes three species listed under the Federal Endangered Species Act. Big Lagoon Rancheria has long sought to locate a casino along the shore of the lagoon on its tribal lands and has been in litigation with the State over its federal right to seek a gaming compact on those lands for over six years.

Big Lagoon Rancheria is a functioning seasonal lagoon that provides critical coastal wetlands for fish and wildlife species. Big Lagoon is home for thousands of migratory birds in the Pacific Flyway and Roosevelt elk and black tailed deer can frequently be found foraging along the Lagoon’s periphery. Fish species that depend on the lagoon include Chinook salmon and listed coho salmon, steelhead and coastal cutthroat trout.

"The Big Lagoon Wildlife Area is managed in its natural state for the preservation of the Big Lagoon and its surrounding flora and fauna. Lagoons are an incubator of life and represent an incredible coming together of species from land, air and fresh and saltwater environments," said L. Ryan Broddrick, director of the Department of Fish and Game. "The area’s protection from development is a high priority for the Department of Fish and Game as we endeavor to protect the Public Trust resources for their use and enjoyment today and for future generations."

Link to additional background about the terms of the compacts.

Link to extension agreements with
Big Lagoon Rancheria of Humboldt County and the Los Coyotes Band of Cahuilla and Cupeno Indians in San Diego County.

KQED's Myers understands circumstances of Big Lagoon's failed deadlines and recognizes Tribe's in triple overtime

as posted 5.31.07 by KQED's JohnMyers at Capitol Notes:





The plan for side-by-side casinos in Barstow could have gone belly up today, as a legal settlement crucial to the proposal was set to expire.

But this afternoon, that settlement was extended -- even though the casino projects in question still face an uphill battle in the Legislature.

As we reported earlier this week, the proposal for casinos owned by the Humboldt County's Big Lagoon Rancheria and San Diego County's Los Coyotes Band of Cahuilla and Cupeno Indians remains in limbo at the state Capitol. Neither tribe believes they can open a gambling facility on their respective reservations, and signed an agreement with Governor Schwarzenegger in 2005 to open casinos in Barstow.

That agreement ended a legal battle in the case of Big Lagoon, where the state has argued that the tribe's coastal reservation is too environmentally fragile for a casino.

But the court settlement was set to expire today. And late last week, Big Lagoon chairman Virgil Moorehead sounded reluctant to keep waiting on the Barstow project.

Now, he's decided to give it one more shot-- an extension of the settlement that will expire on September 17. If the Legislature fails to ratify the two tribes' formal gaming compact by then, Big Lagoon is likely to resume its efforts to build a casino up north... while Los Coyotes would probably have to go back to the drawing board.

Cliched as it may be, the extension of the settlement is a high-stakes gamble. Several powerful Indian gaming tribes in southern California oppose the Barstow plan, arguing that it sets a bad precedent of off-reservation gaming. And the proposal currently sits in the Senate, and doesn't appear to be moving.

In fact, the chairman of the committee that oversees Indian gaming was emphatic last week that the Barstow project isn't on his immediate radar.

"We probably will see that particular compact coming up maybe early next session, but not this session," said Sen. Dean Florez (D-Shafter).

If that's the case, today's announcement won't do much good. But others at the Capitol say a deal may still develop... hence, the need for extra time to make such a deal happen.


NOTE: John Myers is the only reporter to cover this story in the last week who understands the complexity of the situation.

Big Lagoon Rancheria has failed to have Barstow land owned by its Detroit backers transferred into Trust with the Department of Interior by May 31 -- a deadline provision in the Gaming Compact the tribe negotiated with Governor Schwarzenegger in 2005. As such, the Compact, which has failed to win ratification from the Legislature the last two years, would be considered null and void at this point.

And under provisions in the companion "Settlement Agreement" between the State and Big Lagoon Rancheria that was intended to restrict future development on the tribe's Humboldt County reservation; if the Compact (section 14.2) is deemed null and void for failure to meet such deadlines, then the terms of the Settlement Agreement (section M.18.f) are no longer enforceable.

If in fact the Governor has agreed to any extension of the May 31 deadline, it is purely to keep the Settlement Agreement active because as both Virgil Moorehead and Barwest's Tom Shields have acknowledged there is little chance the Tribe will complete the Fee to Trust transfer of the land prior to September 17, the apparent date of the extension. There has been nothing from the Governor's Office to validate what Barwest is spinning publicly.

TVT has welcomed more than 178,000 unique vistors

TVT, founded in December 2006, has averaged more than 20,000 visitors annually. It is produced with the support of scores of individuals from coast-to-coast, each a volunteer citizen activist/jounalist, who review tips and compile the verifiable details and documents that are the hallmark of our content.

Since our first post, more than 178,000 visitors have accessed the details compiled uniquely at TVT.

The citizen activists behind TVT wish to extened a big "THANK YOU" to all those who have provided "tips" -- contributed pictures, documents, link suggestions, leads, reports, insight and comments. Your trust and confidence in TVT has allowed us to create a comprehensive resource that thousands of others -- including bloggers, journalists, Members of Congress and other local citizen activists around the country -- have come to rely upon.

We invite feedback and constructive comment and want you to know you are welcome to do that here in "comments" or by contacting us directly and confidentially via allverifiable@gmail.com

Google News: Indian Gaming

NEWS: Bay Mills Indian Community & Casino Proposals

NEWS: Shinnecock Indian Nation (Gateway Casino Resorts) Casino Proposals

NY Times: Shinnecock Indian Nation

NEWS: Los Coyotes Indian Tribe

NEWS: Los Coyotes / Barwest Barstow Casino Proposals

NEWS: Michael J. Malik, Sr.

NEWS: Marian Ilitch

Muckety.com: Mapping Social Networks

Play with the interactive tool here or visit Muckety.com

TIP: Search for multiple entries in the Muckety.com database simultaneously by separating their names with the word and

certainly must reads!

Ilitch has backed loosing sports teams and pizza, but casinos in Detroit? Forbes.com 10.09.06 ● Marian Ilitch #1 on "25 Most Powerful People" to Watch 2006” global gaming business o1.oo.o5 ● My Kingdom for a Casino Forbes 05.08.06 ● Big Lagoon’s casino dream awakens north coast journal 07.28.05 ● Shinnecocks launch legal claim to Hamptons land newsday.com 06.16.05 ● Ilitch Plans to Expand Casino Empire RGTonline.com 07.05.05 ● Ilitch outbids partners MichiganDaily.com 04.14.05 ● Ilitch enmeshed in NY casino dispute detnews.com 03.20.05 ● Marian Ilitch, high roller freep.com 03.20.05 ● MGM Mirage to Decide on Offer for Casino in Detroit rgtonline.com 04.16.05 ● Secret deal for MotorCity alleged freep.com 02.15.05 ● Los Coyotes get new developer desertdispatch.com 02.08.05 Detroit casino figure to finance Barstow project LasVegasSun.com 07.07.03 ● Indian Band trying to put casino in Barstow signonSanDiego.com 06.04.03 Pizza matriarch takes on casino roles detnews.com 10.23.02 ● Vanderbilt gets short straw in negotiations for a casino Lansing Journal 10.06.02 ● Indians aim to drive family from tribe in vicious dispute san diego union tribune 04.09.00 ●Malik owns 2000 Michigan Quarter Horse of the Year Michigan.gov 01.01.00 ● Detroit Team to run Michigan’s newest Indian casino detnews.com 05.23.99 Tiger ties tangle Marian Ilitch detnews.com 04.29.99 ● Three investors must sell their Detroit casino interests gamblingmagazine.com 04.25.99 ● Partners’ cash revived election; They say money was crucial to Prop-E detnews.com 04.25.99 Investors have troubled histories las vegas review journal 04.27.99 ● Investor served probation for domestic assault on 12 year old boy detnews.com 04.25.99 Can a pair win a jackpot?: local men hope to... crainsdetroit.com 03.17.97

The Verifiable Truth